Project No. 53-179
Towns of Glastonbury and Wethersfield
PUTNAM BRIDGE
(Route 3 over Connecticut River)
Bridge Deck Repair and Resurfacing
including weekend roadway directional closures
The Department of Transportation plans to patch and resurface the Putnam Bridge between the months of April and July 2008.
The work is anticipated to be performed over ten weekends. Weekend directional closures of the bridge roadway are planned for the performance of extensive concrete bridge deck repairs and resurfacing. It is anticipated both bridge northbound and southbound roadways will require five weekend closures to complete the required work. During each weekend roadway directional closure, travel in the opposing direction will remain unrestricted. Local access to and from Route 3 in Glastonbury and Wethersfield will be maintained during all weekend construction work. Proposed detour plans may be viewed through these links:
The Connecticut Department of Transportation
2800 Berlin Turnpike
Newington Connecticut 06131-7548 |